Corrugated Double Layer Roll Forming Machine
Voltage: 380v/220v 50hz 3p can be customized according to customer requirements
Production Time: 30-35 working days
Shipping Time : 40 days
Thickness : 0.3-0.8mm
Produce Speed : 10-15m/min
Port : Tianjin
No. |
Number |
Corrugated Double Layer Roll Forming Machine |
1. | Operation style | Automatic |
2. | Raw materials | PPGI |
3. | Structure | 350H Beam |
4 | Middle side | 16mm |
5. | Main motor | 5.5kw |
6. | Pump station | 4kw |
7. | Cutting type | Hydraulic cutting |
8. | Produce speed | 10-15m/min |
9. | Chain | 1 inch |
10. | Shaft material | Cr12MoV |
11. | Brand of electrical control cabinet | Delta or customized according to customer requirements |
12. | Touch screen/inverter | Delta or customized according to customer requirements |
13. | Rolling materials | Forged 45# steel with chrome plate |
14. | Cutting blade material | Cr12, treatment off 58 ℃ -60 ℃ |
15. | Roller diameter | Φ70mm |
16. | Voltage | 380v 50hz 3p be customized |
17. | Thickness | 0.3-0.8mm |
18. | Rows |
18 13 |
19. | Size | 9000mm*1500mm*1600mm |
20. | Weight | 6000kg |
1. Turn on the power of the tile press and ensure that the power supply is stable.
2. Preheat the equipment. The preheating time may vary depending on the type and specifications of the tile press.
3. Prepare the tile materials to be processed and place them on the workbench of the tile press.
4. Adjust the parameters of the tile press. According to the material and size of the tile, set appropriate processing parameters, including pressure, speed, etc.
5. Program setup and loading. Load the tile design pattern to be processed into the control system of the tile press and make corresponding program settings.
6. Start automatic processing. According to the set program, the automatic operation mode is started, allowing the tile press to process according to the preset patterns and parameters.
7. Monitor the processing process. Observe the processing process of the tile press, check the quality and processing effect of the tiles, and ensure the accuracy and consistency of the processing.
8. End processing. After the processing is completed, stop the automatic operation mode of the tile press, disassemble the processed tiles, and prepare for the next batch of processing.
1. Operate strictly in accordance with operating procedures
2. Before starting the machine, add lubricating oil regularly, at fixed points, and quantitatively according to the requirements of the lubrication chart. The oil should be clean and free of sediment. Non-designated personnel are strictly prohibited from operating the equipment. Normally, people must leave the machine and stop it.
3. The lubricating oil in the motor bearings should be replaced and refilled regularly, and the electrical parts should be checked regularly to see if they are working normally, safely and reliably.
4. Regularly check whether the V-belt, handle, knobs, and buttons are damaged. If they are severely worn, replace them on time and report spare parts for replenishment.