The roofing sheets machine price is a piece of equipment specially used to process tiles. The basic principle is to hot-press and shape the tiles so that they have a certain hardness and strength to meet specific use needs. The operation process mainly includes: blanking, feeding, pressing, cooling and other links.
No. |
Number |
Roofing Sheets Machine Price |
1. | Operation style | Automatic |
2. | Raw materials | PPGI |
3. | Structure | 350H Beam |
4 | Middle side | 16mm |
5. | Main motor | 5.5kw |
6. | Pump station | 4kw |
7. | Cutting type | Hydraulic cutting |
8. | Produce speed | 10-15m/min |
9. | Chain | 1 inch |
10. | Shaft material | Cr12MoV |
11. | Brand of electrical control cabinet | Delta or customized according to customer requirements |
12. | Touch screen/inverter | Delta or customized according to customer requirements |
13. | Rolling materials | Forged 45# steel with chrome plate |
14. | Cutting blade material | Cr12, treatment off 58 ℃ -60 ℃ |
15. | Roller diameter | Φ70mm |
16. | Voltage | 380v 50hz 3p be customized |
17. | Thickness | 0.3-0.8mm |
18. | Rows | 13 |
19. | Size | 6500mm*1500mm*1600mm |
20. | Weight | 5000kg |
1. Preparation
1). Check whether the machine and parts are intact. If damaged, repair or replace it in time.
2). Make sure the work area is tidy to prevent debris from interfering with the operation.
2. Set parameters
1).First select the desired tile type and specification, and adjust the machine's settings to suit that specification.
2).Adjust the speed and pressure of the tile press to ensure the quality and production efficiency of the tiles.
3. Processing tiles
1). Place the metal material to be processed on the machine and ensure that the fixing force is appropriate. 102). Start the tile press to process according to the preset parameters.
4. Complete processing
1). When the processing is completed, take out the processed tiles in time and conduct necessary inspections.